apeas engineering, construction, contracting and foreign trade co.lnc.

 

 

 About Apeas

 Company Profile

 Organization

 Our Companies

 Ongoing Projects

 Completed Projects

 Contributors

 Contacts

 Cataloque

 

 HomePage

 

 Русская версия

 

Board of Directors

Yusuf Kamil Taymaz  President, Chairman of the Board

Vahide Zuhal Ozcan  Vice Chairman of the Board

Merih Cemal Taymaz  Board Member

Finance Coor.&Consultant

Asuman Soylemez

Management

Yusuf Kamil Taymaz  General Manager

Davut Azmi Erbaş    Deputy General Manager, Technical

Ali Ormancıoğlu     Deputy General Manager, Admin.&Trade

Ferda Aksan         Kazakhstan Regional Manager

 

COMPANY POLICIES AND QUALITY ASSURANCE

APEAS is very much aware of the need to provide efficient and comprehensive services that conform to the requirements of the Client and to provide documentation that ensures the required quality standarts are being achieved. A quality control engineer is employed at each site. All the works are done under the supervision and control of him.There are laboratories at sites when needed, to check the quality of concrete works. An architect checks and controls the finishing works. Our quality management process complies with the Turkish Standarts (TSE), American Concrete Institude (ACI), German Standarts (DIN) and Uzbek Norms. The quality control engineer reports to the project manager daily and it is submitted to the head office monthly.

 

PROGRAM

Detailed programs of the project works when the Project commences, clearly indicating all key milestone dates and representing a vital element of the overall program for the Projects shall be prepared. We will plan, control and co-ordinate our work together with the works of others as time and co-ordination of the works to be undertaken are of the essence. All of the previous contracts have been completed on schedule. We are using different Project Management software (i.e.Microsoft Project (TM) Version 2000 and 2002). Our existing presence in the country will significantly assist in the mobilization of the works and will enable the earliest possible start on site once all necessary approvals and permits have been obtained.

 

MATERIAL

The Company would source some of the construction material from within local market. These are limited as follows; Cement, Reinforcement bars, Sand and Gravel.

 

LABOR

The source of management and engineering staff will be Turkiye. Skilled and competent personnel will be mainly sourced from Turkiye and unskilled labor will be mainly recruited locally. Only skilled personnel will be employed for the execution of the works. Therefore no on-the-job training regarding skills is envisaged. However, regular  training regarding safety, security, healt and environment protection programs will be carried out at site.

 

EXPATRIATE MANAGEMENT AND SUPERVISION

In the ongoing projects in Uzbekistan only approximately 20-30 % of the labor is provided locally. A similar percentage is also envisaged for this projects.

 

PROJECT CONTROLS

Work Control Process Daily reports are taken in working plan at site. Montly reports are given to Headquarters in Ankara. All the works should be done according to the time schedule.

 

ACCOMMODATION

Temporary facilities to support the construction and completion of the Facility will be provided at the site. These are including as follows; 1-Accommodation and amenities for staff and labor. 2-Sanitary accommodation. 3-Temporary Site Office for Contractor's workforce, including facilities for the Company. 4-All temporary warehousing and storage yards for the protection and storage of permanent plant,equipment,materials and temporary facility materials an area of 3000m2 5-Temporary fencing with a height of 2mt. 6-First Aid facility. 7-All temporary equipments and material including shoring concrete forms,bracing, ladders, scaffolding staging, tarpaulins etc. 8-All utilities  to operate and service the foregoing facilities including telephone, fax and radio communications, potable water and electric power.

 

SECURITY

The Site, the Works, products, material, plant and any existing buildings affected by the Works will be adequately safeguarded from damage and theft. All reasonable precautions shall be taken to prevent unauthorised access to the site, the Works and adjoining property. Field safety inspections are conducted by safety personnel wherever needed.

 

CONSTRUCTION MACHINERY & EQUIPMENTS

Please click this item for taking the complete list.